Construction engineering and inspection services were provided for this $41 million project, which widened the bridge over Cedar Creek Lake from two lanes to four.
The 2.94-mile project included the construction of a new two-lane bridge (0.92 miles), sheet pile walls, new storm sewer and drainage structures, embankment, base, and HMAC and CRCP pavement.
							Halff Services 
 Involved
						
					- Construction Services
- Environmental
- SUE/Utility Coordination
- Surveying